Software question - Power Director 7

vbimport

#1

Well, I’m surprised I can still type. Glad to be a new member of CD Freaks. I’m ready to rip the hair out of the left side of my head (trying to edit video clips in Power Director 7). I’m doing something wrong. Does anyone know how to push the video track to start at the beginning after the title track? My video and title tracks are running simultaneously so that when the title track is finished the video track is 10 seconds into the material instead of starting at the beginning. :doh:I hope this makes sense. If anyone knows what I do, I would appreciate it. I’m doing what they do on YouTube and it’s not working on my machine.


#2

Moved to Video Edit forum.